| This is my friend Shawn. He helped me finish taking off the flooring and piled up the joists as I cut them down. |
![]() |
| All cut off! |
![]() |
| Saw dust from head to toe... very itchy! |
![]() |
| had to remove these bolts off the house side. (this is where an LVL still has to go.) |
![]() |
| the triple 2x10's are bolted into these steel beams |
![]() |
| first set I had to cut to get started. they are free but sitting on the concrete column... but not for long :) |
![]() |
| 1 down- 3 to go |
![]() |
| the steel beams are bolted to a concrete pad. So unbolt the bottom and the top and guess what you can do??? |
![]() |
| however, this beam was nailed to the house itself. so after literally hanging on it, beating it with a sledge hammer and prying until I was wore out... I decide to go another route. |
![]() |
| after I took the ledger board off the house, the final beam came down with ease :) |
![]() |
| and there you have it! I wish all of my sheeting looked as new as the spot where the sunroom was. Oh well, hopefully it will pass the sheeting inspection. |